Rooftop Solar Pv System Mahadiscom
4 e mail id if available.
Rooftop solar pv system mahadiscom. To get such a system up and running rooftop owners have to first apply to. Connectivity to the distribution network of msedcl for consumers installing solar pv projects systems below 1 mw on rooftop or any mounting structure in their premises under the merc net metering for roof top solar photo voltaic systems regulations 2015 procedure for application methodology for metering billing. 9 voltage at which existing supply. X application will be automatically cancelled if the rooftop renewable energy generating system is not commissioned within 6 months from the date of sanction of application.
8 sanctioned load contract demand in kw kva hp. Maharashtra s power distribution utility msedcl mahadiscom has announced a net metering policy for the state. Metres 130 square feet of flat shadow free area preferably south facing. The ht consumers 11 kv and above may install and connect rooftop solar pv systems at their lt bus bar system provided that in such cases the net meter shall be installed on the ht side of the transformer.
Msedcl has uploaded the detailed policy on its website www mahadiscom in as per the msedcl policy any lt or ht consumer in msedcl s area who intends to install a solar photovoltaic pv system. Voltage level threshold limit of rooftop solar pv system 1 230 240 v 1 ф less than 8 kw 40 a 2 400 415 v 3 ф less than 80kw 100 kva less than 150kw 187 kva municipal corporation areas 3 11kv and above up to 1000 kva up to 1000 kva mumbai metropolitan region 6. Above 5 kw per solar pv system installation location nc head 62921 9 gl code 30501017 8 5 the consumer or person if found eligible for installation of solar pv systems under net metering shall have to execute net metering connection agreement after approval of connectivity of rooftop solar pv system before the start of actual generation. 5 alternate address for communication if any.
6 category of existing electricity connection. As of december 2015 guidelines have been made available for all solar rooftop owners who wish to set up a grid tied pv system on their roof. Documents to be submitted. A consumer intending to set up a roof top solar net metering system or who has already installed such a system may download the application form from the msedcl s website mahadiscom in and submit it duly filled along with technical details of the system to the concerned office of msedcl along with registration fee or apply and pay the fee.
Roof top solar pv system is to be installed. The solar pv installation beyond 40 of dtc rated capacity may be allowed upon consideration of detailed load study on particular dtc. A 1 kw rooftop solar pv system generally requires 12 sq. 9 how much area is required for 1 kw rooftop solar pv system.