Stone Masonry Wall Section
The construction work of stone masonry should be raised uniformly.
Stone masonry wall section. Wall section over continuous rigid insulation cmu. The masonry work should be properly cured after the completion of work for a period of 2 to 3 weeks. 6 installation guide for adhered manufactured stone veneer 5th edition 3rd printing revised september 2019 table 1. The plumb bob should be used to check the verticality of erected wall.
Steel frame with sheathing foundation wall base. Stone masonry the construction of stones bonded together with mortar is termed as stone masonry where the stones are available in an abundance in nature on cutting and dressing to the proper shape they provide an economical material for the construction of various building components such as walls. These details have been developed according to accepted construction standards and practices. Stone masonry types and uses and construction selection of stones what is stone masonry.
The section of wall to be adopted depends upon the height of wall the nature of the backing and the slope of cutting. Installation over wood framing. The stone masonry section should always be designed to take compression and not the tensile stresses. 4 or 2 vertical with the minimum top width of 60 cm.
With the installation of cleanouts this can be done. Grouting with cleanouts high lift grouting many times it is advantageous to build the masonry wall to full height before grouting rather than building it in 5 ft 1 520 mm increments as described above. Amsv installation requirements summary1 backup wall system10 sheathing substrate5 water. The front and back batters of the wall vary from 1 in 4to 1 in 2 1in horizontal.
And the in plane and cross section masonry pattern. These design philosophies are summarized in allowable stress design of concrete masonry strength design provisions for concrete masonry and post tensioned concrete masonry wall design refs. Wall section parapet with stone cap. Wall section insulated concrete form icf top view.
Arriscraft cadd is a comprehensive sample detail system to aid design professionals. Irregular stone masonry wall panel 1 2 m high per 1 0 m wide and 0 5 m thick have. 51 mm gap is required at base of the stud wall to a. In the past many experimental.
Brick masonry stone masonry or plain concrete retaining walls. See the section titled consolidation and reconsolidation in this tek. Wall section over continuous rigid insulation with z channel top view.